Reports
Showing 1
- 5
of 5
-
March 3, 2010
Projections of Jobs, Population and Households August 2008 (148.31 KB)
City of San Jose, Center for the Continuing Study of the California Economy
The Center for Continuing Study of the California Economy (CCSCE) prepared projections of job, population and household growth for the City of San Jose. The work was conducted under a contract with Beacon Economics to assist the City in the Envision San Jose 2040 General Plan Update planning process. This work, along with Association of Bay Area Government's (ABAG) projections, form the basis of the projected wastewater flows for the Plant Master Plan. -
March 3, 2010
2007 Infrastructure Condition Assessment (38.65 MB)
City of San Jose, CH2MHill
The 2007 Infrastructure Condition Assessment (ICA) is an estimate of the costs and timeline to repair the current Plant facilities to work as they were designed. The ICA does not take into account new facilities, new technologies, or other community values (like sustainability). The ICA recommends the completion of a master plan to create a road map for the Plant's repair and replacement needs. -
January 6, 2010
Pond A18 Opportunities and Constraints Report 1-30-07.pdf (38.29 MB)
Author: H.T. Harvey and Associates, et al
Detailed description of the opportunities and constraints related to existing habitats, surrounding land use, transportation, and regulations, of the former salt pond, Pond A18 on Plant lands. -
January 6, 2010
Plant Land Opportunities and Constraints Report 1-30-07.pdf (19.92 MB)
Author: H.T. Harvey and Associates, et al
Detailed description of the opportunities and constraints related to existing habitats, surrounding land use, transportation, and regulations, of the Plant lands. -
February 18, 2009
Plant Master Plan Baseline Public Opinion Survey (1.18 MB)